Blog / Pricing

How pricing actually works — and how to compare two quotes fairly

No fake price list here. What a real quote is made of, why two quotes for the same room can look completely different, and what to check before you decide.

Ask three flooring or remodel companies for a quote on the same room and you'll often get three numbers that don't look like they're for the same job — because a lot of the time, they aren't. Here's what actually goes into a quote, so you can tell the difference between a better price and a smaller scope.

What a real quote is made of

  • Material. The flooring, slab, cabinetry, or fixtures themselves — this varies the most, since a mid-range LVP and a premium engineered hardwood aren't priced anywhere near each other.
  • Labor. The actual install time, which depends on square footage, layout complexity, and how many trades are involved.
  • Prep work. Subfloor repair, removal and disposal of old material, moving fixtures — this is the line item most likely to be missing from a lowball quote.
  • Overhead. Every company has some — the question worth asking is how many hands your money passes through before it reaches the person actually doing the work.
Why we don't publish a price list: cost genuinely depends on your material choice, square footage, and what's underneath your current floor or counters. Anyone quoting a firm number without seeing the room is guessing — which is why every estimate here starts with an in-home visit, free, before any number gets attached to it.

Why the same job gets different quotes

The biggest gap between quotes usually isn't markup — it's scope. One company includes subfloor repair and haul-away in the number; another quotes the install only and treats anything else as a change order once work has already started. One employs its installers directly; another sells the job and hands it to whichever subcontractor is free that week, adding a layer of margin between what you pay and what the crew actually sees.

That second point is a real driver of cost, not just a talking point — a subcontracted job usually has to cover the general contractor's margin on top of the subcontractor's own price. Keeping material in stock and managing installation ourselves is part of how we keep a number from growing between the estimate and the invoice.

How to compare two quotes fairly

  • Is material cost broken out separately from labor, or bundled into one number you can't audit?
  • Does the quote include subfloor prep, disposal, and cleanup — or are those "if needed" add-ons?
  • Is it itemized by room/material, or one lump sum for the whole project?
  • What happens if they find a problem once the old material is out — is there a pre-agreed process, or is it a surprise?

A lower number with a narrower scope isn't dishonest, but it's not the same offer as a higher number that covers the whole job. Line them up side by side before you decide which one is actually cheaper.

Want a real number for your room? It starts with a free visit, not a guess.