Cabinetry, counters, tile and fixtures, sequenced as one job — not four separate handoffs.
A full kitchen remodel runs in a real sequence: demo, any electrical or plumbing rough-in, cabinetry, countertop templating, countertop install, backsplash tile, then fixtures and appliances. Each step depends on the one before it, which is why a kitchen with four different subcontractors on four different schedules is where remodels stall out.
What most people aren't told: the real bottleneck on most kitchen timelines isn't labor — it's material lead time. Cabinetry and countertop fabrication often take longer than every day of actual install work combined. And if you're moving a sink, gas line, or electrical circuit, permits and city inspections add calendar time that's outside any contractor's control — ask early what in your plan might trigger that, so it's not a surprise mid-project.
Full kitchen remodel — Acue Marmonite crew
White Waterfall Island
Black Galaxy Leather Island
Shiplap & Waterfall Edge
Lincoln Gold & Brass Hardware
Dark Cabinetry & Waterfall IslandEvery kitchen is different — we work out finishes and layout together during your in-home estimate.